PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Job site Facing South (800x600).jpg Moving the rebar Facing West (800x600).jpg Rebar mats at Elev. 1,2,3 2nd Floor Facing South-West (800x600).jpg Tying up the rebar mats at Elev. 1,2,3 2nd Floor Facing South-East (800x600).jpg Working on Shear Wall panels for Elev. 1,2,3 2nd Floor Facing South-West (800x600).jpg
Previous page Working on Shear Wall panels for Elev. 1,2,3 2nd Floor Facing South-West (800x600)
Working on Shear Wall panels for Elev. 1,2,3 2nd Floor Facing South-West (800x600)